[1. Call to Order. ]

[00:00:07]

SCOTT IS NOW 1:31 P.M. ON TUESDAY DECEMBER 14 IN A CALL THIS MEETING OF THE ABILENE METROPOLITAN PLANNING ORGANIZATION TRANS MATURITY POLICY BOARD TO ORDER.

NUMBER ONE, ON THE ADDENDA, STATEMENT THAT PUBLIC COMMENT

[2. Consideration and Take Action on the minutes of the August 17, 2021 meeting and workshop. ]

CAN BE TAKEN ON ANY ITEM ON THE AGENDA AND NUMBER TWO IS CONSIDERATION AND ACTION ON THE MINUTES OF AUGUST 17, 2021 MEETING AND WORKSHOP AND THERE WERE A COUPLE OF THINGS I SAID TO LISA THAT SHE CORRECTED AND I DON'T KNOW IF IT IS IN THE

PACKET WE HAVE. >> NO, SIR.

IT IS NOT. I CAN GO OVER THOSE REAL QUICK.

ON THE FIRST PAGE UNDER THE TACK PODIUM MEMBERS MR. LITTLE, JOHN THAT SHOULD BE ENTERED INTO THE RECORD OF PLANNING AND DEVELOPING SERVICES AND THEN ON PAGE EIGHT AT THE VERY BOTTOM WHERE WE ARE TALKING ABOUT FM 1082 THE THIRD TO THE LAST PARAGRAPH OR THIRD TO THE LAST SENTENCE THEIR WORDS IS PLANNING TO RELOCATE THE RUNWAY TO THE THAT HAS BEEN CHANGED TO THE NORTH OF THE DAM AND SO AFTER ROADWAY TO THE NORTHWAY OF THE

DAM. >> ANY OTHER CORRECTIONS, ADDITIONS, AT LEAST FOR THE MINUTES? IF NOT I WILL ENTERTAIN A MOTION.

>> MOTION TO APPROVE HIS CORRECTED.

>> SECOND. >> HAVE A MOTION AND ABATEMENT,

[3. Receive a Report and Hold a Discussion regarding possible extension of deadline to choose a consultant for the Comprehensive Transportation Corridor Study and the potential need to hold a specially called meeting. ]

ALL IN FAVOR SAY I PEERED ANY OPPOSED? THE MINUTES ARE APPROVED AND WITH ITEM NUMBER THREE RECEIVE A REPORT TO CALL THE DISCUSSION POSSIBLE EXTENSION OF DEADLINE TO CHOOSE CONSULTANT FOR THE COMPREHENSIVE TRANSPORTATION COURT ORDER STUDY AND POTENTIAL NEED TO HOLD, ESPECIALLY CALL THE MEETING. LISA.

>> SO THIS ITEM IS AS SET OF THE SCREEN APPEAR IS FOR THE 322 AND THE STATE HIGHWAY 36 AND THIS WAS IN THE YOU PWP AND I REALLY DON'T HAVE MUCH TO UPDATE YOU ON JUST THAT WE ARE WORKING THROUGH THE PROCESS STILL. THIS IS THE DATA COLLECTION THAT WE ARE CURRENTLY LOOKING AT AND THIS MIGHT HAVE TO BE MODIFIED AND CONDENSED AND WE ARE STILL LOOKING AT AVAILABLE FUNDING TO MAKE SURE THAT WE HAVE ENOUGH FUNDING TO DO WHAT WE NEED TO DO WITH THE SCOPE AND WE ARE STILL WORKING THROUGH THE CONTRACT PROCESS. I WOULD JUST REALLY WANT TO GIVE YOU ALL AN UPDATE ON WHAT WE WERE LOOKING AT AND THEN HAVE ANY FEEDBACK IF YOU ALL HAD ANY QUESTIONS.

>> WITH THE POINTS THAT ARE ON THE MAP THERE THERE IS NOT ANY THAT ARE INSIDE THE LOOP AND I WAS WONDERING WHAT TIMEFRAME WOULD WE BE LOOKING AT HAVING THEM COLLECT DATA BECAUSE OBVIOUSLY THE FALL WHEN YOU HAVE THE FAIR AND FOOTBALL GAMES THERE WILL BE MORE SEVERE TRAFFIC THEN THE SPRING OR

SUMMER. >> YES, SIR.

WE HAVE BEEN LOOKING AT SOME OF THE LOCATIONS AROUND AND THEY ARE SO LIKE THE EXPO CENTER THEY HAVE AN EVENT COMING UP IN JANUARY AND THERE ARE SOME OTHER SO WE'VE BEEN LOOKING AT SOME OF THE MAJOR TRAFFIC GENERATORS IN THAT AREA AND WE HAVE ALSO TRYING TO FIND OUT THE BEST TIME TO DO THAT DATA COLLECTION.

AS I SAID THE SCOPE MAY NARROW SLIGHTLY JUST DEPENDING ON HOW MUCH FUNDING IS AVAILABLE AND WHEN WE WORK THROUGH THAT

PROCESS. >> ANY OTHER QUESTIONS ON THIS

ITEM? >> ANYTHING YOU ARE LOOKING FOR US TO PROVIDE YOU WITH THIS ITEM?

>> NO, SIR. WE HAD ORIGINALLY SCHEDULED THAT TO SEE ABOUT HAVING A SPECIAL CALLED MEETING BECAUSE THE RFQ WENT OUT AND WE GOT THOSE ON NOVEMBER 4 AND SO MOST OF THEM HAD A 90 DAY REVIEW TIME AND SO THAT WOULD BE FEBRUARY 4 FOR THAT 99 DAYS TO BE UP BUT WE SHOULD BE ABLE TO GET AN EXTENSION ON THAT SO THIS TIME I'M NOT ASKING THE BOARD FOR ANY

ACTION. >> THERE IS NO ACTION ON THIS

[4. Receive a Report, Hold a Discussion, and Take Action on an amendment to the FYs 2020-2045 Metropolitan Transportation Plan (MTP). ]

ITEM SO WE WILL MOVE ON TO ITEM NUMBER FOUR, RECEIVE A REPORT ON THE DISCUSSION AND TAKE ACTION ON AN AMENDMENT TO THE FY 2020-2045 METROPOLITAN TRANSPORTATION PLAN.

>> SO THIS IS A SPECIAL DAY, YOU ALL GET TO LOOK AT ALL THE MAJOR REPORTS THAT WE DO. THIS IS THE FIRST ONE AND THIS IS THE 25 YEAR PLANNING DOCUMENT AND SO WE HAD SOME CHANGES THAT WE INCORPORATED INTO THIS ONE AND THE FIRST CHANGE, OF COURSE, IS THE PAGE THERE, THE MM AND THIS IS AMENDMENT NUMBER THREE.

THE ITEM HERE AND INCLUDED IN YOUR PACKET IS THE PROJECT PRIORITIZATION AND SO IT HAS ALL THE BACKGROUND DATA FOR THIS AND SO THOSE PAGES IN YOUR DOCUMENT SHOW THE PERFORMANCE MEASURES AND THE THINGS THAT WE USED TO DO, THE PROJECT RANKING.

IF YOU LOOK THROUGH THERE ARE TWO NEW PRODUCTS ARE ADDED.

ONE IS THE LOOP 22 AT HIGHWAY 36 AND THIS IS JUST INTERSECTION IMPROVEMENTS. WE DON'T HAVE ANY FUNDING FOR THAT YET BUT IT IS IN HERE AS PROJECT RANKING AND THEN THE OTHER ONE IS FM 1082 AND THIS IS THE EAST OF THE DAMN ROAD WHICH IS JUST THE NEW ROADWAY NORTH OF FM 1082 AND THEN THE PROJECT SCORNS THERE IS USED IN THE DATA THAT YOU FIND IN YOUR PACKET SO THAT IS WHERE THE PM 123, FOUR AND FIVE COME IN AND THEN YOU CAN SEE THE TOTAL SCORE THERE AND IF YOU LOOK AT THE RANKING WE DID NOT WANT TO REDO ALL OUR NUMBERING SO WE HAVE 11.5 AND EIGHT 27.5 ON THAT. THIS IS THE MAP THAT SHOWS THE FUNDED AND UNFUNDED PROJECTS AND SO YOU CAN SEE ITEM NUMBER 38

[00:05:03]

WAS ADDED WHICH IS UP THERE ON THE NORTH SIDE OF THE DAM AND THEN THE OTHER ONE IS THAT END WHICH IS ADDED RIGHT THERE AT THE LOOP 322 AND STATE HIGHWAY 36.

THIS IS THE ACTUAL SHOWING THE FUNDED PROJECTS PAGE AND SO YOU CAN SEE THAT FM 1082 AND RIGHT NOW WE HAVE THE TOTAL COST IS THE 7,362,482 AND THE MPL FUNDING OUT OF CAT TWO IS 3 MILLION FOR THAT. THIS IS THAT LUKE 322 AND THIS IS JUST A PLACEHOLDER BASICALLY AND WE DON'T HAVE ANY CONSTRUCTION COST OR ANYTHING LIKE THAT SO IT IS JUST IN THERE AS A PLACEHOLDER AND IT IS THERE SHOWN ON THE MAP UNDER ITEM NUMBER N. WE ALSO UPDATED THE GROUP PROJECTS PAGE AND WE REALIZE THAT WE DID NOT HAVE A BRIDGE REPLACEMENT OR REHABILITATION IN THE ORIGINAL MTP SO WE HAVE ADDED THAT TO MAKE SURE THAT WE CAN CAPTURE THOSE PROJECTS IN THE GROUP PROJECTS THAT NEED BE. AND THEN ON THE RIGHT-HAND SIDE OF THE PAGE THEY ARE YOU SEE THIS IS A AMENDMENT NUMBER THREE PENDING APPROVAL BY THE POLICY BOARD AND THEN IT SAYS UPDATED GROUP PROJECTS TO INCLUDE A BRIDGE CATEGORY AND THEN ADDED IN THOSE TWO PROJECTS THAT WE JUST DISCUSSED.

THIS WAS PRESENTED TO THE TACHOMETER AT THE LAST MEETING AND THEY DID RECOMMEND APPROVAL TO THE POLICY BOARD AND AT THIS TIME WE ARE ASKING FOR APPROVAL OF THE AMENDMENT FROM THE POLICY

BOARD. >> OKAY, THANK YOU, LISA.

ANY QUESTIONS ABOUT THE MTP? >> MAKE A MOTION TO APPROVE.

>> MOTION TO APPROVE DO I HEAR A SECOND?

>> SECOND. >> I HAVE A SECOND ALL IN FAVOR SAY I, ANY OPPOSED, THE AMENDMENT FOR THE MTP HAS BEEN

[5. Receive a Report, Hold a Discussion, and Take Action on an update to the 10-Year Plan. ]

APPROVED AND WE WILL NOW MOVE TO ITEM NUMBER FIVE WHICH IS RECEIVE A REPORT IN WHOLE DISCUSSION AND TAKE ACTION ON AN

UPDATE TO THE TEN YEAR PLAN. >> INCLUDED IN YOUR PACKET IS THE TEN YEAR PLAN AND I ALSO PUT THE BIG SHEETS IN THERE SO IT IS A LITTLE EASIER TO SEE AND SO THESE ARE THE SAME AMENDMENTS THAT WE JUST DISCUSSED IN THE LONG-RANGE PLAN AND THIS IS THE TEN YEAR PLAN SO WE ARE PULLING THOSE DOWN INTO THIS PLAN.

THE FIRST THING I WANTED TO POINT OUT THIS IS THE UNIFIED TRANSPORTATION PLAN AND THIS IS FOR 2022 AND IF YOU LOOK THERE AT THE TOP ABILENE MPO THIS IS THE FUNDING THAT WE RECEIVED OVER THAT YEAR TIME AND THIS IS ALL ESTIMATES, OF COURSE, BUT IF YOU LOOK ACROSS THEIR IT IS SHOWING 58061891 AND THAT IS FOR THAT TEN YEAR TIME THAT WE ARE DISCUSSING WITH THIS TEN YEAR PLAN. IF YOU LOOK ON, LIKE I SAID, IN THE BIG PAGE IN YOUR DOCUMENT OR ON THE SCREEN THE ITEMS IN RED ARE THE ITEMS THAT WE HAVE HAD A CHANGE TO SO WE ADDED IN THAT NEW ROADWAY THAT FM 1082 AND AT THE BOTTOM THERE THAT IS FM 1750 AND STATE LOOP 322 AND THOSE DO NOT HAVE FUNDING CATEGORIES ASSOCIATED WITH THEM AT THIS POINT AND SO YOU DON'T SEE ANYTHING EVER IN THE FUNDING PART OF THAT.

THE SOUTH 14TH WALK ABILITY PROJECT, YOU CAN SEE THAT WAS ADDED IN THEIR SENTENCE REGIONALLY SIGNIFICANT BUT THERE IS NO FUNDING REQUIRED FROM THE MPO ON THAT.

IF YOU LOOK AT THE TOP OF THAT SHEET YOU CAN SEE THE PROJECTED FUNDING SO THAT MATCHES WHAT WE JUST DISCUSSED ALL THE WAY ACROSS THE TOTALS AND THEN ON YOUR REMAINING BALANCE ONE OF THE THINGS I DO WANT TO POINT OUT THAT YOU CAN SEE THE REMAINING BALANCE AND IF YOU LOOK AT THE RUNNING BALANCE WE ARE 34,000 IN THE HOLE ON 2022 OR IN THE NEGATIVE AND IF YOU LOOK ON THIS PAGE THAT EXPLAINS WHY.

THIS IS THE SECOND PAGE IN YOUR DOCUMENTS.

SO WHEN THIS PROGRAM ORIGINALLY STARTED BACK IN 2015 YOU CAN SEE THE PROJECTS THAT HAVE BEEN COMPLETED AND AT THE END OF THAT 2021 TIME THAT IS WHY IT STARTS 34 IN THE NEGATIVE.

BUT IF YOU LOOK ACROSS AND IT GETS BACK INTO THE BLACK SO WE ARE GOOD AS WE MOVE FORWARD. AND THAT IS REALLY ALL I HAD ON THAT. WE DID MOVE OUT AND I WILL POINT OUT THE VERY LAST ONE THERE, THE FARM TO MARKET AT ANSLEY ROAD, WE HAD DISCUSSED THIS BEFORE AND THIS WAS MOVED OUT AND PUSHED FOR THE BACK BECAUSE THERE WERE TOO MANY PROBLEMS WITH THE DESIGN AND SO THAT ONE HAS BEEN PUSHED OUT OF THE TEN YEAR PLAN.

DID ANYBODY HAVE ANY QUESTIONS FOR ME ON THAT?

>> ANY QUESTIONS. >> NOT AT ALL, ENTERTAIN A

MOTION. >> SO MOVED.

>> MOTION APPROVED, TENURE PLAN AMENDMENT, UPDATE RATHER.

A SECOND? >> I WILL SECOND.

>> AND WE HAVE A SECOND. ALL IN FAVOR SAY I, ANY OPPOSED?

[6. Receive a Report, Hold a Discussion, and Take Action on an amendment to the FYs 2021-2024 Transportation Improvement Program (TIP). ]

AMENDMENT OR UPDATE IS APPROVED AND WE MOVED TO ITEM NUMBER SIX, RECEIVE A REPORT AND FOLLOW DISCUSSION AND TAKE ACTION ON AN AMENDMENT TO THE FY 2021-2024 TRANSPORTATION IMPROVEMENT

PROGRAM. >> OKAY SO IN THIS DOCUMENT IN YOUR PACKET THIS IS THE ONE THAT THIS IS THE FIFTH AMENDMENT AND YOU CAN SEE THERE ON THE BACKGROUND THAT THE THIRD AMENDMENT WAS THE DECEMBER 15 AND THEN WE HAVE

[00:10:01]

ADMINISTRATIVELY AMENDED IT FOR THE FOURTH AMENDMENT SO THIS MAKES THE FIFTH AMENDMENT AND WITH THAT I WILL TURN IT OVER TO BEN AND HE WILL SORT OF WALK YOU ALL THROUGH THE CHANGES IN THAT

DOCUMENT. >> SO ON THE FIRST PAGE IN THE CHANGES ONLY SECTION IN THE PACKET AND ALSO ON THE SCREEN YOU CAN SEE WE UPDATED THE COVER SHEET TO SAY AMENDMENT FIVE DECEMBER 14, 2021 PENDING APPROVAL AND THEN WE ALSO UPDATED THE TABLE OF CONTENTS TO SHOW THAT NEW PAGES HAVE BEEN ADDED TO MOVE THOSE OTHER ONES BACK AND THEN ON THE THIRD PAGE WE HAD PUBLIC PARTICIPATION AND OR PUBLIC REVIEW FOR THIS DOCUMENT WAS HELD FROM DECEMBER 42 YESTERDAY DECEMBER 13 AT 5:00 P.M. AND ALSO AVAILABLE FOR PUBLIC COMMENT TODAY AT THIS MEETING AND THAT NOTICE WAS POSTED IN THE ABILENE REPORTER NEWS ON DECEMBER OR MAC AND THEN THESE FIRST TWO PROJECTS IN FISCAL YEAR 2021 WE ARE JUST MOVED UP FROM 202222021 AND I BELIEVE, YES, THE COST WAS ALSO UPDATED AND THE REVISION DATE FOR EACH OF THOSE WAS UPDATED AND THEN IN 2023, ON THE NEXT PAGE, WE ADDED THE FM 1082 RELOCATION PROJECT AT THE TOP THERE AND THEN WE UPDATED THE COST OF THE OTHER, THE FOREIGN MARKET 3034 PROJECT, PROJECT COSTS ON THOSE TWO PROJECTS, AS WELL AND THAT IS ALSO NOTED ON ALL OF THOSE OR BROKEN DOWN ON THAT FINAL PAGE OF THE PROJECTS AND WE ALSO HAVE THE MAP UPDATED TO SHOW EACH OF THOSE PROJECTS.

AND THEN ON THE NEXT PAGE WE HAVE JUST A LITTLE INSERT SAYING THAT WE DID GET THE, ONE OF THE TA PROJECTS THAT WE APPLIED FOR AND THAT WILL BE THE SOUTH 14TH STREET WALK ABILITY PROJECT AND WE GOT A TOTAL OF, WELL, WE GOT FEDERAL FUNDS OF 1,749,000 AND THAT IS GOING TO BE A TOTAL OF $2,186,000 PROJECT AND THEN ON THE NEXT PAGE WE HAVE, WE ADDED IN A SECTION UNDER THE TRANSIT FUNDING FOR 5307 CATEGORY FUNDING FROM THE, FROM THE AMERICAN RESCUE PLAN FOR 2022 AND THEN WE ALSO HAVE THE FINANCIAL SUMMARY TO THE, TO REFLECT THAT CHANGE AND ON THE FINAL PAGE WE HAVE ALL OF THE UPDATES THAT WERE MADE, COVER PAGE, TABLE OF CONTENTS, HIGHWAY PROJECT, THE TRANSIT PROJECT AND THEN THIS AMENDMENT PAGE AND WE ARE ALSO GOING TO UPDATE THE MINISTRY OF AMENDMENT FOR TO SHOW THAT GROUP CS J WAS PRESENTED ON APRIL 20 AND WE DID NOT NEED ANY ACTION TAKEN AT THE

TIME. >> THIS DOES REQUIRE A PUBLIC REVIEW AND ANY COMMENTS THAT YOU HAVE RECEIVED WE DID NOT RECEIVE ANY TODAY IN OUR TEN YEAR COMMENT.

BUT ANY RECEIVED IN THE MEETING WILL BE INCORPORATED

[INDISCERNIBLE] >> ANY QUESTIONS ON WHAT WAS PRESENTED FOR THIS UPDATE? IF NOT, AS STATED THIS ITEM CALLS FOR A PUBLIC HEARING AND AT THIS TIME I WILL OPEN THE PUBLIC HEARING AND IF ANYONE WOULD LIKE TO COME AND SPEAK FORWARD, PLEASE COME FORWARD AND STATE YOUR NAME FOR THE RECORD.

>> SEE NO ONE I WILL CLOSE THE PUBLIC HEARING.

ANY OTHER QUESTIONS OR DISCUSSION?

>> I WILL SAY THE TAX DID APPROVE THIS AND RECOMMENDED TO THE POLICY BOARD THERE WERE A FEW MINOR CHANGES WHICH WE DID NOTE AND WE DID MAKE THOSE CHANGES AND SO IT WAS

RECOMMENDED [INDISCERNIBLE] >> OKAY, NO OTHER QUESTIONS I

WILL ENTERTAIN A MOTION. >> MAKE A MOTION TO APPROVE THE.

>> SECOND. >> I HAVE A MOTION AND A SECOND, ALL IN FAVOR SAY I, ANY OPPOSED? MOTION IS APPROVED AND WE WILL

[7. Discussion and review of transportation projects. (By TxDOT Staff, City Staff, CityLink Staff) ]

MOVE TO ITEM NUMBER SEVEN, DISCUSSION, REVIEW OF

[00:15:02]

TRANSPORTATION PROJECTS. I BELIEVE [INDISCERNIBLE]

>> PAUL IS NOT HERE AND I WILL FILL IN FOR HIM.

HE IS TIED UP WITH A CONTRACTOR, GETTING READY TO START A BUFFALO GAP PROJECT SO THEY ARE HAVING A MEETING OVER THAT THIS AFTERNOON. SO YOU CAN ALL SEE WHAT IS ON THE SCREEN HERE AND I WANT TO FOCUS ON THE RED BOX AT THE BOTTOM OF THE PAGE, CURRENT CONSTRUCTION PROJECTS AND JUST HIT ON A COUPLE OF THOSE. FIRST, REALLY THE FIRST ONE AND TWO ARE THE FIRST SAME PROJECT AND THAT IS REMINGTON CLARK PROJECT OR OVERPASS AND THEN RELOCATE [INDISCERNIBLE] AND THAT PROJECT IS COMPLETED AND WE ARE JUST WORKING ON THE FINAL PUNCH LIST AND TRYING TO GET EVERYTHING WRAPPED UP IN BUT PRETTY MUCH PROJECT IS DONE AND SKIP TO THE THIRD PROJECT WHICH IS PEDESTRIAN WORK THAT THE [INDISCERNIBLE] BUNKER BROTHER CONSTRUCTION HAVE AND THAT PROJECT IS STILL AGGRESSING AND THEY ARE STILL DOING SIDEWALK WORK AND EXPECTED TO COMPLETE THAT IN FEBRUARY, THIS COMING FEBRUARY.

MOVING TO PROJECT NUMBER FOUR, THIS IS WHERE WE CONSTRUCTED A NEW [INDISCERNIBLE] NEAR AND LEE ROAD, SOUTH OF TOWN HERE AND AGAIN THAT PROJECT IS PRETTY MUCH COMPLETED AND THE ONE THING THAT WE ARE LACKING IS WE ARE STILL HAVING ONE SIGNAL INSTALLED AND WE BEEN KIND OF WAITING ON SERVICE FOR THAT BUT WE HAVE BEEN FIXING TO TURN THE SIGNAL ON IN THAT JOB WOULD BE PRETTY MUCH WRAPPED UP AS WELL. THEN WE COULD JUMP TO PROJECT NUMBER FIVE, FM 3438 AND THIS IS JUST AN OVERLY PROJECT THAT WE HAVE SCHEDULED SO THAT IS EXPECTED TO START NEXT MONTH AND FINISH AT SOME POINT AUGUST OR SEPTEMBER OF THIS COMING YEAR.

PROJECT NUMBER SIX AND SEVEN ARE TOGETHER AND THAT IS 70, 15, STATE HIGHWAY 36 AND THAT WAS MILL AND OVERLAY HERE IN TOWN AND THAT PROJECT IS BEING COMPLETED AND GETTING THAT THING CLOSED UP. PROJECT NUMBER EIGHT IS WE HAVE A SAFETY PROJECT TO INSTALL A FLASHING BEACON THERE AT HILL STREET IN THE BUSINESS ROUTE AND SO THAT PROJECT IS GETTING READY TO GET KICKED OFF AND WE HAD A LITTLE BIT DELAY BECAUSE YOU GOT TO OVERGROWN POLLS AND THAT ORDERS TIME AND SO LOOK AT AND THEN PROJECT NINE AND TEN AGAIN SAME PROJECT BUT THAT IS THE PROJECT THERE ON BUFFALO GAP WHERE WE ARE WORKING DOWN THERE AGAIN THAT IS SUPPOSED TO START FIRST PART OF JANUARY AND WE ARE HAVING MEETINGS WITH THE CONTRACTOR TODAY AND THAT IS WHERE IT FALLS AT AND THAT IS A BIG PROJECT FOR US IN BIG PROJECT FOR THE CITY AND SO WE ARE TRYING TO MAKE THAT AS PAINLESS AS POSSIBLE OR AS CAN BE.

BUT WE ARE LOOKING FORWARD TO THAT PROJECT.

THEN WE SEE PROJECT 11 AND 12 THAT ARE TIED TOGETHER AGAIN AND THAT IS JUST ESSENTIALLY A REHAB OF FM 600 GOING OUT TOWARDS [INDISCERNIBLE]. AND THEN WE SEE PROJECT 13 AND 14 IN THE SAME CONTRACTOR AND WE ARE WORKING ON ITEMS AND LEFT TURN LANES AT THOSE LOCATIONS AND THEN PROJECT 15 YOU WILL SEE THE BRIDGE AT ONE CAP CALL CREEK THAT WE HAVE BEEN WORKING ON AND I KNOW THAT IS KIND OF BEEN A HARD BURN FOR SOME SO THAT PROJECT IS GOING AND THEY ARE EXPECTED TO COMPLETE THAT IN MARCH OF THIS COMING YEAR AND CONTRACTOR IS ACTUALLY MOVING ALONG AND THEY MIGHT ACTUALLY FINISH THAT EARLIER SO THAT IS

THE CURRENT. >> 'S ON 15 WE DO FEEL GOOD ABOUT THE COMPLETION MARCH AND POSSIBILITY OF EVEN EARLIER?

COMPLETION DATE. >> CORRECT.

>> THE REALLY GOOD ABOUT THE MARCH COMPLETION DATE BARRING SOME BAD WEATHER, BAD WINTER WEATHER OR SOMETHING WE MAY HAVE BUT WE FEEL GOOD ABOUT THAT D DATE.

SO WE CAN GO TO THE BOX JUST AHEAD OF THAT AND I WILL HIT ON A FEW OF THESE PROJECTS THAT ARE COMING UP AND REALLY WANT TO FOCUS THERE ON THE FIRST PROJECT IS THE OVERPASS OUT AT LANDFILL ROAD THEN THAT IS REALLY SITE ONE AND TWO, BOTH THOSE PROJECTS, AND THAT WE RECENTLY HAD A PUBLIC MEETING OVER THAT PROJECT AND WE REALLY DURING THE PUBLIC MEETING RECEIVED A LOT OF POSITIVE COMMENTS FOR THAT JOB AND SO WE ARE CONTINUING TO MOVE

[00:20:02]

ALONG AND TRY TO, TRY TO FINISH THAT PROJECT WHERE WE CAN LET IT IN OUR FY 23 IF WE CAN GET ALL THE RIGHT OF WAYS STUFF TAKEN CARE OF AT THE TIME SO THAT PROJECT IS MOVING ALONG AND IT DOES HAVE SOME SOME OF OUR CAT FOR MONEY AND CAT TAX MONEY.

PROJECT VOID BOOL IS ON MY 20, AS YOU PROBABLY KNOW WHEN YOU DRIVE TO I 20 THROUGH HERE IT IS VERY LOUD BECAUSE OF A NUMBER OR I GUESS A FEW YEARS BACK WE WENT IN AND MILLED THE SURFACE JUST A LITTLE BIT TO GET MORE TRACTION BECAUSE TO GET A LITTLE MORE FRICTION ON THE ROAD FOR SAFETY IN THIS PROJECT COMES BACK IN AND PUTS A NEW SURFACE ON I 20 HERE THROUGH ABILENE.

SO THAT IS PROJECT THREE AND FOUR.

AND THEN YOU WILL SEE PROJECT FIVE WHICH IS FM 1082 AND THAT IS THE PROJECT THEIR BY THE DAM OR AT LEAST IT WAS REFERRED TO IN SOME OF THE EARLIER COMMENTS. AND THEN YOU WILL SEE SOME OTHER PROJECTS DOWN THROUGH THERE AND THAT GETS US TO 24 AND IF YOU ALL HAVE QUESTIONS ON THOSE I WILL DEFINITELY TAKE THEM BUT I THINK FOUR TIMES SAKE I WILL SAVE THOSE AND I WILL SAY THAT WE DO HAVE ON OUR PUBLIC INVOLVEMENT RIGHT NOW ON THE SCHEMATIC FOR INTERSTATE 20 ESSENTIALLY FROM OLD ANSON ROAD TO THE COUNTY LINE AND SO THAT SECTION WE ARE CURRENTLY WORKING ON A SCHEMATIC AND TRYING TO WIDEN THAT TO SIX LANES TOTAL, THREE IN EACH DIRECTION, ALONG WITH PUTTING IN OVERPASS AT JUDGE ELITE WHICH HAS BEEN REQUESTED AND THEN CAN BE REALIGNED WITH SOME RAMPS AND POSSIBLY MOVED AND THEN MAKE THEM SAFER SO THAT PROJECT IS, AGAIN, WE ARE JUST IN THE PUBLIC INVOLVEMENT PHASE SO WE ARE LOOKING FOR PUBLIC FEEDBACK AND SO ANY FEEDBACK WE GET WILL BE VERY HELPFUL TO US SO.

THAT IS ALL I HAVE UNLESS SOMEONE HAS QUESTIONS.

>> THANK YOU, GLENN. ANY QUESTIONS? ALL RIGHT. WE WILL MOVE TO THE CITY OF ABILENE [INDISCERNIBLE] SCOTT I GUESS IS COVERING THAT FOR US.

>> YEAH, REAL QUICK. WE ARE KINDA FORTUNATE RIGHT NOW AND WE HAVE FINISHED UP MOST OF OUR CONSTRUCTION PROJECTS.

THE MAIN ONE THAT WE WILL BE COMING UP IN JANUARY IS THE 27TH STREET PROJECT AND THE BETWEEN [INDISCERNIBLE] AND BARROW AND WE HAD A GREEN ECONOMY DECIDED TO GET THROUGH THE CHRISTMAS HOLIDAYS AND GET TO THE NEW YEAR AND START ON THAT. UNFORTUNATELY THAT WILL BE SOMEWHAT CLOSE BOX COMMITTEE TO THE BUFFALO GAP JOB SO I GUESS WE WILL JUST ADD INSULT TO INJURY AND TEAR UP EVERYTHING AT ONE TIME BUT THAT PROJECT WILL GET UNDERWAY IN JANUARY AND WE ALSO HAVE THE FIVE-POINT ROADWAY IMPROVEMENT FOR WEILER ROAD AND MARIGOLD. I THINK WE HAVE IN THE HD CONSULTANT ON THE PROJECT AND THEY ARE DOING SOME FINAL MARKUPS FOR US HOPING TO GET A FINAL SET OF PLANS BACK FOR THEM AND AS SOON AS WE GET READY WE WOULD BE ABLE TO SEND THAT OUT FOR BID AND THAT WILL BE UNDERWAY IN THE NEW YEAR'S AS WELL. THE OTHER PROJECTS WE'VE GOT OUR WORK ZONES, 2022 WORKS OWN PROJECTS, S9, S11 AND IT IS N15 AND ALL THOSE ARE [INDISCERNIBLE] FIELD TYPE PROJECTS AND WORKS OWN AREAS, RESIDENTIAL AREAS IN THE CITY AND THEN WE ALSO HAVE A FAR SOUTH KIND OF SOUTHERN END OF TOWN WORKS OWN AS 25 THAT WE ARE GOING TO BE PROPOSING A CEILING TYPE PROJECT SO NOT A MILL AND THE FILL BUT SET OF ROADWAYS IN BETTER CONDITION AND WILL BE ADDING A SEAL PROJECT, SEAL TIGHT PRODUCT ONTO THE ROADWAY TO PRESERVE IT.

THE MAPLE STREET PROJECTS, THE FIRST PHASE FROM 7072 CARRIAGE HILL, I DON'T KNOW IF YOU KNOW BUT IT IS UNDER CONSTRUCTION RIGHT NOW AND THEN WE ARE FOLLOWING UP AND WE WILL START THE DESIGN PROCESS FOR THE SOUTH PIECE OF MAPLE BETWEEN CARRIAGE HILLS AND THE LOOP AND THEN ALSO THE NORTH FROM THE LOOP ALL THE WAY TO EAST SOUTH 11TH AND THAT WILL ALL BE UNDER DESIGN AT THE SAME TIME. OUR PLAN IS BECAUSE OF THE UTILITY RELOCATIONS ON THE NORTH SIDE AND JUST THE KIND OF NATURAL PROGRESSION TO THE NORTH WE ARE GOING TO PUSH DO YOU HAVE OUR FIRST PROJECT PICK UP RIGHT AT CARRIAGE HILLS AND GO TO THE

[00:25:04]

LOOP AND THAT WILL PROBABLY BE THE FIRST PROJECT THAT COUNSEL SEES FORBID THIS NEXT YEAR AND FOLLOWED BY EAST NORTH TENTH PROJECT AND THEN MORE THAN LIKELY WE WILL, ONCE THE CONSTRUCTION ON THE SOUTH PORTION OF MAPLE HAPPENS EAST NORTH TENTH IS UNDERWAY WE WILL PROBABLY MOVE THEN INTO THE NORTH PART WHICH WILL BE THE BIGGEST PROJECT BETWEEN LOOP 322 AND EAST SOUTH 11TH. THOSE ARE THE MAIN PROJECTS WE HAVE EITHER GOD IN DESIGN OR MOVING ALONG TO CONSTRUCTION.

IF THERE ARE ANY QUESTIONS YOU ALL HAVE, LET ME KNOW.

>> ANY QUESTIONS? THANK YOU VERY MUCH.

>> [INDISCERNIBLE] IS HERE TO DO CITY LINK.

>> GOOD AFTERNOON. >> AFTERNOON.

>> WANTED TO KIND OF GIVE YOU ALL A QUICK UPDATE ON SOME OF THE THINGS THAT WE'VE GOT. AS YOU CAN SEE AS PART OF YOUR PACKET THERE WE HAVE BEEN IN PRACTICE OF UPDATING OUR TRANSIT MANAGEMENT PLAN [INDISCERNIBLE] AND HAVE BEEN DOING THAT ON THE MANUAL BASIS AND WE CONTINUE TO DO THAT BUT WE JUST RECENTLY HAD A NEW GUIDANCE FROM FTA THAT THE ONLY ONE THAT DONE EVERY FOUR YEARS, STARTING OCTOBER 23, OCTOBER OF 2022 SO WE WILL FOLLOW THAT GUIDANCE AND TO THE ACTUAL FULL-BLOWN UPDATES EVERY FOUR YEARS AFTER THAT. WE WILL STILL BE WORKING ON THE ANNUAL UPDATES BECAUSE WE HAVE TO TOUCH THE FLEET INVENTORY PORTION OF THAT PLAN BECAUSE THAT IS WHAT ACTUALLY DRIVES OUR NTB REPORTER, NATIONAL TRANSIT DATABASE, REPORT THAT WE HAVE TO DO ON A MANUAL BASIS SO THOSE TWO DOCUMENTS KIND OF WORK HAND-IN-HAND SO THAT IS WHY WE WILL CONTINUE TO TOUCH THE FLEET INVENTORY PART OF IT AND WILL ONLY PRESENTED TO THE POLICY BOARD ONCE EVERY FOUR YEARS STARTING NEXT OCTOBER.

>> BOBBY, EXCUSE ME JUST ONE SECOND.

YOU ALL HAVE A HAND OUT SO IT'S LITTLE DIFFERENT THAN WHAT IS IN YOUR PACKET. IF YOU ALL WANT TO LOOK AT WHAT HE IS TALKING ABOUT BUT SORRY, ABOUT THAT.

>> SURE. THE NEXT ITEM THAT I PUT DOWN IS THE WE ARE GETTING READY TO PUBLISH THE RFQ FOR ARCHITECTURAL AND ENGINEERING SERVICES CONSULTANT SERVICES FOR DESIGN SERVICES FOR OUR CURRENT FACILITY AND THERE ARE SOME UPDATES WE NEED TO DO AND WE HAVE SOME FUNDING IN PLACE FOR REHABILITATION AND WE HAVE ALSO ARE GOING TO BE UTILIZING THESE OR THIS VERB TO HELP US HOPEFULLY PUT OUT THE DESIGN FOR A NEW FACILITY AND WE GOT THE FUNDING IN PLACE FOR THE TEXT .

THAT WE WERE PROMISED ABOUT A YEAR AND A HALF AGO SO WE HAVE BEEN GOING THROUGH THE RFQ STAGE AND GETTING IT ALL WRITTEN UP AND DEVELOPED AND WE ARE ABOUT READY TO PUT THAT ON THE STREET BUT THEN IN THE NEXT WEEK OR TWO AND I AM HOPING TO SEE THAT WITHIN THE NEXT 60 DAYS OR SO WE WILL HAVE A FIRM IN PLACE TO HELP US CARRY FORWARD WITH THESE PROJECTS SO.

>> GREAT. >> AND ON THE OLD NOTES AND MENTIONED THAT THE TWO BUSES THAT ARE BEING ORDERED AND THAT

IS CITY COUNCIL AT THIS WEEK. >> YES, SECOND READING WILL BE IN THE FRONT OF CITY COUNCIL AND KNOCK ON WOOD, EVERYTHING GOES AS PLANNED AND WE ARE ISSUING THAT ORDER AND JUST AS A NOTE WITH THESE TWO LARGE BUSES I HAVE BEEN IN CONTACT WITH OUR BUS MANUFACTURER. FORTUNATELY, THE ELECTRONIC CHIP SHORTAGE THAT IS WREAKED HAVOC ACROSS THE WORLD IT DOESN'T PLAY A SERIOUS OF AN ISSUE WITH THESE LARGE BUSES BECAUSE THEY ARE WIRED A LITTLE DIFFERENTLY SO THAT IS A GOOD THING FOR US.

A 12-14 MONTH PRODUCTION TIME WHICH IS ABOUT NORMAL, ESPECIALLY THIS TIME OF YEAR SO THOUGH SHOULD BE COMING THROUGH AS PLANNED. NOW, IF YOU COULD RECALL SEVERAL MONTHS AGO WE DID PRESENT PLACED AN ORDER FOR SOME REPLACEMENT CUTAWAY VEHICLES AND OF COURSE WITH THOSE, THOSE ARE THE CAPS ARE ACTUALLY JUST LACKING THE OTHER COMMON [INDISCERNIBLE] VEHICLE, CHIP SHORTAGES ARE AN ISSUE AND NORMALLY THE MANUFACTURING TIME WOULD BE SIX-EIGHT MONTHS AND WE HAVE ALREADY SURPASSED THAT SO YEAH, IT WILL BE ANOTHER FOUR OR FIVE MONTHS BEFORE WE ACTUALLY SEE A VEHICLE BUT WE DO KNOW THAT

[00:30:02]

THOSE CHASSIS ARE IN THE QUEUE TO BE BUILT BUT JUST HAVE NOT

BEEN BUILT YET. >> I HAVE A QUESTION.

IN REGARDS TO THE NO MODAL TRANSPORT SYSTEM AND [INDISCERNIBLE] YEARS AGO WE HAD A CONVERSATION ON A COLLABORATIVE EFFORT WITH CITYLINK AND/OR THE TIME BRINGING ON AND WORKING TOGETHER AND PROVIDING PROVIDING ONE CENTRAL TYPE UNIT IN REGARDS TO [INDISCERNIBLE] DESIGN.

ANY OPPORTUNITY THERE TO COLLABORATE WITH THEM? I BELIEVE, AS FAR AS REASONS [INDISCERNIBLE], THIS IS SOMETHING THAT WE HAVE NOW THOSE WHO USE A GREYHOUND SYSTEM, IS THEIR OPPORTUNITY TO WORK WITH THEM POSSIBLY?

>> I CERTAINLY HOPE SO. I KNOW THAT JUST LIKE IN YEARS PAST WITH IN TRYING TO WORK WITH GREYHOUND IT IS STILL A CHALLENGE AND IT IS PROBABLY, I WOULD GO OUT ON A LIMB AND SAY IT IS PROBABLY MORE OF A CHALLENGE TO COMMUNICATE WITH THEM NOW THAN IT WAS, YOU KNOW, 15 YEARS AGO.

IT IS JUST BECAUSE OF THE DYNAMICS OF THE COMPANY AND BASICALLY FACING OUT ALL THE SO-CALLED STOREFRONTS THAT THEY USE TO HAVE AND THEY PHASE THOSE OUT PRE- MUCH ALMOST EVERYWHERE.

>> BUT HERE IN ABILENE, OTHER COMMUNITIES, THEY HAVE CHOSEN TO PARTNER WITH CONVENIENT TYPE STORES OR ENTITIES THAT, I MEAN, IT FEELS VERY AWKWARD AND I WOULD LOVE AN OPPORTUNITY IF THERE IS A CHANCE TO TAKE A CONTRIBUTION FOR OTHER RESOURCES TO INVITE A MORE AND MODEL MORE CONSISTENT CREATION OF THIS COMMUNITY AND REGION IN REGARDS TO HOW WE HANDLE THOSE USING THE

GREYHOUND SYSTEM SO. >> RIGHT.

YES, IT WOULD BE VERY BENEFICIAL AND ADVANTAGEOUS TO, NOT ONLY THE CITY, BUT THE TRAVELING PUBLIC TO BE ABLE TO HAVE THAT AS A ONE STOP SHOP AND IN THE FUTURE WE WILL DEFINITELY BE GOING TO CITY COUNCIL AND HELP US WITH SOME OF THE SUPPORT LETTERS FOR SOME OF THE GRANT OPPORTUNITIES LIKE WE HAVE IN THE PAST SO I AM HOPING THAT WILL COME THROUGH, ESPECIALLY WITH OUR OR THE NEW INFRASTRUCTURE BILL THAT IS BEEN PASSED WE ARE REALLY CURIOUS TO SEE HOW THAT WILL COME OUT AND WITH WHAT KIND OF FUNDING STREAMS THOSE WILL CREATE SO WE

MAY JUST SEE IT AFTER ALL. >> THANK YOU.

ANY OTHER QUESTIONS FOR BOBBY? THANKS, BOB.

[8. Discussion and review of reports: ]

>> THANK YOU. >> WE WILL MOVE TO OR THAT CONCLUDES ITEM NUMBER SEVEN AND WE WILL MOVE TO ITEM NUMBER EIGHT, DISCUSSION, REVIEW OF REPORTS STARTING WITH FINANCIAL

STATUS. >> OKAY, INCLUDED IN YOUR PACKET IS THE YEAR END YOU CAN SEE THAT JULY, AUGUST AND SEPTEMBER BILLING WAS INCLUDED AND THE AUTHORIZATION TOTAL WAS 44371892 AND THE EXPENDITURE FOR THE YEAR WAS 23383056 AND THAT LEAVES A REMAINING BALANCE OF 209888.36 AND THAT WOULD BE THE CARRYOVER FUNDS THAT WILL BE GOING INTO THE NEW FISCAL YEAR.

ON THE NEXT PAGE, SORRY, ON THE NEXT PAGE IS THE FISCAL YEAR 2022 AND CURRENTLY WE ONLY HAVE ONE WORK ORDER THAT HAS BEEN ISSUED AND THAT IS 45744028 AND WE DON'T HAVE ANY EXPENDITURES THAT HAVE BEEN SUBMITTED SO THAT IS THE TOTAL OF THE FINANCIAL

SUMMARIES. >> ANY QUESTIONS.

>> LISA, WHAT WAS THE CARRYOVER FROM THE PREVIOUS YEAR?

DO YOU RECALL? >> YES, SIR.

I DO HAVE THAT HERE. JUST A SECOND.

SO THE, IF I CAN READ IT, THE PREVIOUS YEAR WAS, CARRYOVER WAS

185 [INDISCERNIBLE] >> THANK YOU.

>> YES, SIR. >> ANY OTHER QUESTIONS?

>> MOVE TO THE OPERATIONS REPORT.

>> OKAY. INCLUDED IN YOUR PACKET IS THE FULL OPERATIONS REPORT AND THIS COVERS, SINCE WE DID NOT HAVE AN OCTOBER MEETING, IT COVERS QUITE A LONG TIME THERE.

I WON'T GO OVER EVERYTHING BUT JUST POINT OUT A FEW THINGS.

I HOPE ALL OF YOU ARE GETTING THE MPO INSIDER NEWSLETTER, EMMA HAS BEEN MAKING IT MUCH MORE INTERACTIVE SO IT IS NICE TO SEE THAT AND THEN THERE WAS SOME, QUITE A FEW MAPS THAT WERE PRESENTED AND THEN WE, WE PARTNERED WITH THE DRIVE SAFE COALITION AND TXDOT AT THE APB NIGHT OUT WHICH WAS ON OCTOBER 5 AND THAT WAS EXCITING AND WE GOT TO SEE A LOT OF PEOPLE AND TALK TO THEM ABOUT TRANSPORTATION SO THAT WAS ALWAYS GOOD AND THEN SOME OF THE EVALUATION FORMS AND THEN THE MMS THAT YOU ALL JUST SAW SO THOSE ARE SOME OF THE THINGS AND OPERATIONS REPORT AND AS I SAID OPERATIONS REPORT IS IN YOUR PACKET AND RAN FROM AUGUST 7 THROUGH DECEMBER 3 SO QUITE A LONG TIME THERE.

>> ANY QUESTIONS ON THE OPERATIONS REPORT?

GO TO THE DIRECTORS REPORT. >> OKAY ON THE DIRECTORS REPORT THE ANNUAL LISTING OF OBLIGATE PROJECTS AND THE ANNUAL

[00:35:02]

PERFORMANCE AND EXPENDITURE REPORT FOR FISCAL YEAR 2021 SO WE ARE CURRENTLY WORKING ON THE ANNUAL PERFORMANCE AND EXPEND OTHER REPORT THAT SHOULD BE SUBMITTED ON TIME TOMORROW AND WE WILL DO A LITTLE TWEAKING TO IT BUT IT SHOULD BE READY TO GO.

THE ANNUAL LISTING OF OBLIGATE PROJECTS WE ARE STILL WAITING ON THE INFORMATION FROM TXDOT AND SO ONCE WE GET THE HIGHWAY PORTION OF THAT WE HAVE THE TRANSIT READY TO GO AND SO WE WILL JUST DROP THAT INTO THE REPORT AND THAT WILL BE SUBMITTED AS SOON AS WE CAN GET THE INFORMATION FOR THAT.

SO IT WILL NOT BE BY THE DEADLINE, BY THE WAY, I DON'T THINK WE WILL GET IT TODAY AND SO THE DEADLINE IS TOMORROW ON THAT. THE PERFORMANCE MEASURES WILL BE BRINGING BACK THE PM ONE TO YOU ALL ON DECEMBER FIRST AND THE PUBLIC TRANSIT AGENCY SAFETY PLAN THAT WILL BE DUE AROUND IN JUNE SO WE WILL HAVE THAT COMING FORWARD AND THEN THE NEW TIP WHICH IS FROM 2023 TO 2026 WILL BE DUE ON JUNE 10 SO YOU WILL SEE THAT IN ONE OF THE FOLLOWING MEETINGS.

THAT IS ALL I HAVE ON THE DIRECTORS REPORT.

>> OKAY. THAT INCLUDES OR ANY QUESTIONS? THAT CONCLUDES ITEM NUMBER EIGHT.

MOVED TO ITEM NUMBER NINE, OPPORTUNITY FOR MEMBER THE PUBLIC TO MAKE COMMENTS ON MPO ISSUES SO THAT AT THIS TIME I WILL OPEN UP THE PUBLIC HEARING TO PROVIDE THAT OPPORTUNITY.

DOES ANYONE WANT TO COME AND SPEAK ABOUT OR MAKE COMMENTS ON

[10. Opportunity for Board Members, Technical Advisory Committee Members, or MPO Staff to recommend topics for future discussion or action. ]

MPO ISSUES? SEEN NO ONE I WILL CLOSE THE PUBLIC HEARING PORTION AND MOVE TO ITEM NUMBER TEN, OPPORTUNITY FOR BOARD MEMBERS, TACTICAL ADVISORY COMMITTEE MEMBERS OR MPO STAFF TO RECOMMEND TOPICS FOR FUTURE DISCUSSION OR ACTION.

ANY TOPICS THAT WE NEED TO CONSIDER AT A FUTURE MEETING?

>> I WILL JUST SAY THAT WE WILL BE TALKING ABOUT THE DATES FOR 2022 AND SO THERE IS A HANDOUT FOR YOU ALL AND THEN WE WILL ALSO BE E-MAILING THAT OUT SO AT THE NEXT MEETING IN FEBRUARY WE WILL BE DISCUSSING THE DATES TO MAKE SURE THAT THEY ARE GOOD FOR

EVERYBODY'S SCHEDULE. >> WE WANT TO STATE THE DATE FOR

THE TEMPORARY MEETING? >> YES.

YES, CIRCUIT VIBRATE 15. >> VALENTINE'S DAY.

ALL RIGHT. ANY OTHER TOPIC OR CONSIDERATION FOR FUTURE MEETINGS? OKAY, I WILL ADVISE YOU THAT FOR

[EXECUTIVE SESSION ]

ITEM NUMBER 11 OR BEFORE I ITEM NUMBER 11 WE WILL GOING TO EXECUTIVE SESSION AND PLANNING ORGANIZATION TRANSPORTATION POLICY BOARD IS GOING INTO EXECUTIVE SESSION UNDER TEXAS GOVERNMENT CODE SECTION 551 . OWES SEVEN FOR PERSONAL MATTERS.

AFTER THAT IS CONCLUDED WE WILL RETURN TO THE PUBLIC MEETING.

THANK YOU FOR YOUR ATTENDANCE. >> IT IS TOO LATE?

[11. Receive a Report, Hold a Discussion and Public Hearing, and Take Action on the evaluation of the Executive Director. ]

AND WE WILL RECONVENE FROM THE EXECUTIVE SESSION.

ITEM NUMBER 11, RECEIVE A REPORT HOLD A DISCUSSION AND HOLD THE PUBLIC HEARING AND EVALUATION OF THE OF A VACUUM EXECUTIVE DIRECTOR. THE BOARD HAS ALREADY HELD OUR EVALUATION AND SENSE A PUBLIC HEARING WAS NOTICED I WILL OPEN UP THE PUBLIC HEARING AND WOULD ANYONE LIKE TO SPEAK FOR OR AGAINST THE VALUATION OF THE EXECUTIVE DIRECTOR? SEEN NO ONE, I WILL CLOSE THE PUBLIC HEARING.

THE POLICY BOARD HAS APPROVED A PAY RAISE FOR THE EXECUTIVE DIRECTOR IN LINE WITH THE PAY INCREASE THAT WAS APPROVED FOR THE CITY AT THE SAME TIMEFRAME AS THE CITY.

WE WILL MOVE TO ITEM NUMBER 12 WHICH IS ADJOURNMENT.

WE DON'T NEED TO TAKE ACTION ON THIS MEETING.

IT IS ADJOURNED FOR IT I APPRECIATE EVERYONE'S ATTENTION AND HOPE EVERYONE HAS A MERRY